Reference-Browser
Reference list
A2/A8 Kirchenwald Tunnel, construction lot 321, Hergiswil
To protect against rock falls, the viaduct section of the A2 motorway between Hergiswil and Stansstad is being replaced by the two 1.6 km long bores comprising the Kirchenwald Tunnel.
A4/A20 Hafnerberg Tunnel, Birmensdorf
The Hafnerberg Tunnel forms part of the A4/A20 Zurich west bypass. It connects the Birmensdorf junction with Reppichstal. Each direction (Basel and Lucerne) has a separate tunnel bore with two driving lanes and a shoulder lane.
A4/A20 Uetliberg Tunnel, Birmensdorf
Part of the A4/A20 Zurich west bypass. Two parallel tunnels each 4,400 m in length. Unconsolidated rock: Gjuch 200 m, Diebis 230 m, Juchegg 390 m. Molasse sections: Eichholz 510, Uetliberg 2790 m. Cut-and-cover section 230 m with Reppichstal ventilation station. Cross-over points every 290 m, of which 3 navigable by traffic, 10 by pedestrians.
ABB Power Tower, Baden
Engineering building ABB Power Tower with around 1,300 office workplaces and 509 parking spaces.
ABZ development Wiedikon, Zurich
Total renovation of the Wiedikon development of the Allgemeine Baugenossenschaft Zurich (ABZ) (General Building Association of Zurich).
AEW car park, Aarau
Trimming off 5 to 7 cm of existing concrete ceilings (3,000 m2) and re-profiling them. Polymer bitumen waterproofing and laying mastic asphalt surfaces. Applying new resin surface in the area of the ramp.
Air-conditioning systems study for MWH Barcol-Air AG, Stäfa
Compilation of a scientific study on behalf of MWH Barcol-Air AG, a leading supplier of indoor air-conditioning solutions. The study uses thermal simulations to compare innovative hybrid chilled ceiling solutions with three conventional air-conditioning systems. The goal is to establish a comparison of the lifecycle costs of different air-conditioning systems.
Alp Transit Ceneri, Lotto 822, Vezia
The construction work in the Vezia section is particularly demanding because it had to be carried out in the middle of a residential area close to the SBB line with very limited space.
Amag-Diana City excavation trench, Schaffhausen
A 12 metre-deep excavation trench with vertical excavation trench closures on all sides was created in the centre of Schaffhausen for the new commercial building with showrooms and a three-level underground car park of Amag-Diana City.
Anton Häfliger AG, Sursee
New construction for logistics platform, service hall for transport vehicles as well as offices and administration areas.
ARGE A2 City Ring, Lucerne
The work for the total restoration of the Lucerne City Ring is being carried out in 5 sub-phases. The tunnel pipes of the almost 600-metre long Reussport tunnel are being restored between 2010 and 2013. The Senti bridges, which have cracked concrete and corrosion on the abutments as a result of leaking road crossings, are also being restored and noise insulation walls installed. The city connection and the Sonnenberg tunnel are also undergoing restoration.
Beaulieu, Lausanne
Renovation of the South Halls of the Palais de Beaulieu in Lausanne.
Birs Bridge 3 / SU Gellertstrasse, Basel
These two bridges are steel constructions dating back to the 1930s. They were reinforced and adjusted in connection with the adjustments to the SBB tracks. The two existing bridges that support the SU Gellertstrasse were replaced by a single, new one which was fitted in.
Blauen TRG 3 Tunnel, Blauen
The Blauen Tunnel formed part of the expansion of the Transitgas AG natural gas pipeline. Our role was that of general contractor. The work comprised project planning and management and execution through to a finished, operational site without installation of the pipeline.
Bucher Hydro Valley, Neuheim
- Implementation of an optimum factory layout for a "breathing factory" in a sophisticated landscape, integrating the existing production halls.
- Operations must be maintained during construction.
Buechenwald Upper School Centre, Gossau/SG
The contract for constructing the new Buechenwald Upper School Centre resulted from a submission as a general contractor. The project is based on ambitious architecture using high-grade materials and also includes the building technology. Implementation according to Minergie-Eco standard.
Bülach court building
Conversion and renovation of the existing Bülach district court. Addition of an annex to expand building.
Bypass tunnel N8, Lungern
Creation of cable block systems by means of three-dimensionally controlled slipform pavers. A six-unit and nine-unit block are industrially manufactured. The cable protection pipes are automatically drawn into the machine and the concrete block machine-made.
Ceneri Base Tunnel lot 853
Lot 853 comprises work on the northern side of the Cenari Base Tunnel (first tunnel cutting and portal construction).
Chienberg Tunnel, Sissach
The 2,300-metre Chienberg Tunnel forms the core of the Sissach bypass. It was cut into the highly geologically challenging mountainside of the Tabel Jura mountain range, which posed a mining highlight on account of its extremely swellable Gipskeuper formation.
City housing development Talwiesen - phase 1, Zurich
Residential complex with 143 rental flats and service space in Zurich-Wiedikon.
City housing development Talwiesen - phase 2, Zurich
Residential development with 144 flats and service space on the ground floor in Zurich-Wiedikon
City housing development Talwiesen - phase 3, Zurich
Residential development with 92 rental flats including service space in Zurich-Wiedikon.
Clinique de la Colline, Geneva
Extension of the Clinique de la Colline by means of an anchored and supported retaining structure in the form of a diaphragm wall.
Construction lot R6, Zurich Airport
- Tunnel heading with earth pressure shield, Lovat TBM
- Steel concrete pipe diameters 2160/2680 mm, length 4.5 m
- Ground conditioning
Construction of a new Letzigrund stadium, Zurich
Construction of a new, multi-purpose stadium.
Coop branches
Supply of a country-wide energy management system consisting of energy data recording or control systems in over 400 branches as well as an overriding server infrastructure.
Coop Trading, Lenzburg
Sustainable reduction of energy consumption, operating costs and CO2 emissions.
Cross-city link (Durchmesserlinie) lot 3.02, escape and rescue gallery for the Weinberg Tunnel in Zurich
Navigable escape and rescue galleries parallel to the Weinberg Tunnel, connected to the main tunnel every 500 m by emergency exits and crossing points. The tunnel heading is being carried out by a gripper TBM with a 4.75 m diameter; tunnel length 4,459 m.
Cross-City Link (Durchmesserlinie), Weinberg Tunnel, Zurich
Section 3 of the Cross-City Link is the Weinberg Tunnel, 4,537 m in length. It reaches from the south-west section to the underground portal in Oerlikon, and comprises two lots. Lot 3.1: South section shaft and expansion through to new station. Lot 3.2: Brunnenhof shaft at a depth of 40 m, Weinberg Tunnel and rock section between Brunnenhof and the Oerlikon portal. Lot 3.2 also includes the escape and rescue galleries with crossing points to the main tunnel.
Cross-city link lot 2.1 - construction of train station shell Löwenstrasse, Zurich
The construction of the Löwenstrasse transit train station is the centrepiece of the new cross-city link between Zurich-Altstetten and Zurich-Oerlikon. The new transit rail station will be built with 3 tracks at a depth of 16 m and a length of 600 m under the existing tracks 3 to 9 and the side hall of the Zurich main train station. At the same time, the retail space in the main train station will be expanded by the new Löwenstrasse Passage.
Cross-city link section 2 and 3 in the area of Zurich train station
The new underground Löwenstrasse transit train station is the centrepiece of the cross-city link. It is being built 16 metres under the existing tracks 4 to 9 while the train station is in operation. This is extremely challenging for everyone involved.
Disposal gallery, Visp
Project management and realisation of the heading and excavation work for the disposal gallery in Visp (4.75 m diameter) as total contractor. The gallery is used as a conveyor belt gallery for the Visp South bypass. Tunnel length: Heading with tunnel boring machine 2,460 m. Machine-assisted heading in unconsolidated rock 60 m.
Dohlenzelg underground car park, Windisch
The flame-retardant properties of the clad concrete ceiling had to be increased and improved. To achieve this, the existing Durisol elements on the soffit were affixed to the concrete ceiling with two fire safety dowels. The seams between the elements were closed with fireproof mortar and the reinforcement segments made of steel were clad with fire protection material.
Double track expansion and lowering of the Zentralbahn railway, Lucerne
The Zentralbahn railway line between Lucerne main railway station and the Kriens Mattenhof station is being expanded to two tracks and is being lowered. This sub-project comprises the 550-metre systematically worked underground Hubelmatt Tunnel, the just under 300-metre underground station at Allmend, located by the Festhalle and connected by three access tunnels, and the 470-metre Allmend cut-and-cover tunnel plus the 144-metre Mattenhof ramp.
Easy Day, Yverdon-les-Bains
Hospitals in North Vaudois. Construction of a building consisting of 3 floors above-ground covering 1,000m2 for outpatient surgery.
Ei AG, Sursee
Logistics platform including automated egg sorting system and administration areas.
EMS and extension of Les MOUILLES shopping centre in Lancy
Construction of an EMS and extension of the MOUILLES shopping centre in Lancy.
Escape gallery, Flüelen bypass, Flüelen
Escape gallery with 9 crossing points to the main tunnel. Tunnel length 2,455 m.
ETH Zurich: construction of new HIT e-Science Lab, Zurich
Construction of new research, instruction and service building HIT.
Felsenau Viaduct subprojects C6.1 and C8, Bern
Maintenance and partial broadening of 10 bridges with a total length of 1,200 m; maintenance of Felsenau Viaduct with a length of 1,108 m and a carriageway width of 25 m. Renovation or construction of 15 support walls with a total length of 713 m and height of up to 16 m. Broadening and renovation of roadworks in the Wylerholz section, including reconstruction of the 900 m of the middle lane and addition of forest and access roads.
Flüelen bypass, Flüelen
Tunnel for Flüelen bypass, 2,540 m long
- Special heading and approach cutting south and north
- Cut-and-cover tunnel south and north emergency bays
- South and north tunnel portal station ventilation control centre and ventilation shaft
Fontanettes lower access gallery, Nendaz
Access gallery with a length of 198 m, 20 m² excavation cross section.
Fredag AG, Root
Redesign of the meat delivery zone/shipping zone and replacement of the refrigeration unit.
Gärtnerstrassenbrücke, Basel
The extension of tram line 8 requires reconstruction of the Gärtnerstrasse bridge across the field. A competition was held for the new bridge which was awarded to Implenia Ltd. as total contractor with the project "Primavera".
GeNaB total evaluation of sustainable construction for Migros-Genossenschafts-Bund
Development and introduction of an instrument to assess sustainability in the construction departments of all Migros construction organisations.
Gösgen nuclear power plant
Construction of new fuel elements and wet storage area and expansion of auxiliary systems building ZC00.
Gotschna safety gallery, Klosters
Safety gallery with escape cross-over points every 300 m. Tunnel length 4,202 m, of which 4,022 m heading with tunnel boring machine. Portal construction in total 140 m using cut-and-cover method.
Gotthard Base Tunnel, Faido multifunction station
Heading, support and internal construction of the 2.4 km long multifunction station.
Gotthard Base Tunnel, lot 360, Sedrun Tunnel
- Railway tunnel with two single-track bores, each 9.0 km long, heading cross-section 60-134 m2 (full-face), cross-over points every 312 m.
- Multifunction station with lengthwise and cross-over chambers, four tunnel cross-over expansions (heading cross-section up to 230 m2), tunnel cross-over connections, side galleries, ventilation galleries and 14 ventilation shafts, 4 waiting chambers.
- Access through access galleries approx. 1 km in length and 2 shafts approx. 800 m deep.
- This is an extremely complex installation.
Gotthard Base Tunnel, sections from Bodio to Faido
Construction of two parallel railway tunnels, each 30 km long, and the Faido multifunction station (see separate reference). Heading, support and internal construction of the two single-track bores.
Halde canton school, Chur
- Complete restoration of the Halde canton school, some work performed when school was in attendance.
- First place in competition for total services.
- Complex decontamination, earthquake-proofing, rock-face stabilisation, restoration of burial chapel from the 5th/6th century.
Hardbrücke restoration, Zurich
The 1,350-metre long structure is used by around 70,000 vehicles per day. The sealing and the pavement have exceeded their life spans, water is permeating the structure. As a result, the structure, which is comprised of six sections (a total of eight exit and entrance ramps), was in dire need of restoration.
High-rise ensemble Quadro-Platz, Zurich
A high-rise ensemble comprised of four buildings with four high-rises of different heights has been under construction in Zurich-Nord since 2000. Upscale, flexible office space on the upper floors and retail space on the ground floor are clustered around the central Quadro-Platz.
Hirslanden clinic, Project HI07, Zurich
5-floor garden wing with nursing department.
Hotel Villa Honegg, Ennetbürgen
Renovation and extension of the Villa Honegg five-star hotel.
Hubelmatt Tunnel of the central railway, Lucerne
The 550-metre long Hubelmatt Tunnel is part of the dual tracking and lowering of the central railway. The Hubelmatt Tunnel heading stretches from the Allmend side, under the Hubelmatt hill, to the north portal, at the junction of Geissensteinring and Sternmattstrasse.
IKEA, Vernier
Construction of the new IKEA centre in Vernier. Work in reinforced concrete (20,000 m3 of concrete and 2,000 t of reinforcement) and laying of floor tiles (60,000 m2).
International School of Geneva, Grand-Saconnex
Construction of the International School of Geneva - Campus des Nations.
Junction and overpasses X1, Z58 and Z59, Härkingen
The three bridges are located in the heart of the Swiss motorway hub in Härkingen, where the A1 meets the A2. Entrances and overpasses that could handle very heavy traffic were required for crossing from one national road to the other.
Klingelnberg Immobilien AG, Zurich
Construction of a new development and administration building in Klingelnberg. A 7-storey, high-quality office building to be used as group head office and a development centre.
Lausanne M2 metro line, lot 1700
- Metro line from Ouchy to Epalinges, via main railway station and Place de l'Europe. Total length 6 km, 14 stations, 9 tunnels and 5 bridge structures.
- Lot 1700: "Route de Berne" Tunnel between the Sallaz and Fourmi stations. Sallaz station and cut-and-cover construction. Fourmi underground station including interior construction, access shaft.
Lausanne metro, lots 1100 and 1200, Lausanne
Construction of two double-track underground railway (metro) tunnels with two underground stations and lowering of the tunnel base in an existing tunnel in the city.
- Flon station 70 m
- St. Laurent station double-track tunnel 306 m
- Riponne station, length 85 m
- Construction in part using cut and cover
- Viret double-track tunnel, length 265 m
- Lowering of the tunnel base in the existing tunnel by approximately (lot 1100)
LCA Supercomputing Center, Lugano
Construction of the new LCA Supercomputing Center.
Le Cristal shopping centre, Martigny
Shopping centre on 2 levels, parking on the roof.
Letzigrund stadium, Zurich
Construction of the new Letzigrund stadium to replace the existing sports facility.
Lungern investigation gallery, Lungern
- Investigation gallery (tunnel boring machine), 1,319 m long
- Safety gallery (tunnel boring machine), 3,595 m long
- Counter-heading (drill & blast), 295 m long, of which 60 m with pipe umbrella
Lützelmurg viaduct, Häuslenen
The usability of the section of the N1 from Hagenbuch to Wängi which opened in 1970 is to be guaranteed in the next few years by means of the planned maintenance measures. To achieve this goal, the Lützelmurg viaduct has to be widened for the planned traffic routing 4/0 and simultaneously overhauled.
Main tunnel of the A8 Lungern bypass, Lungern
The Lungern bypass is around 4.25 km long. The main construction is the 3,574 m long Lungern Tunnel, with two-way traffic. Incline 2.2 %.
Merdisel gallery, Satigny
Waste water gallery, 3.4 m diameter, 1,399 m length with inlet and discharge constructions.
Migros Ostschweiz (Eastern Switzerland)
Supply of energy data or control systems for approx. 70 branches. These form part of a comprehensive energy management and branch maintenance system.
Migros parking deck ramp, Zurich
The area of the road was expanded as a result of the conversion of Pfingstweidstrasse. Because entry to the existing spiral ramp was no longer possible, a new ramp had to be created from the ramp for the Engrosmarkt roof to the Migros parking deck. The new ramp is designed as a bridge with a continuous beam made of six sections and is approx. 110 metres long. The distances range between 12.0 and 24.4 metres. The two end sections and section two are heavily bent. The bridge is connected monolithically to the existing bridge on the side of the Engrosmarkt deck.
Migros-Interio, Etoy
Construction of a shopping centre for Migros - Interio in the ZI Littoral Parc, Etoy.
Montfleury Parc, Versoix
Construction of a 6-storey building + attic providing 39 units of social housing and 51 owner-occupied units.
More capacity for Olten region: Aare bridges/Aare footbridge
The Olten bridge over the Aare river is part of the Olten bypass road while the Aare footbridge is the new footpath and bike trail connection over the Aare and thus creates the link both to the city centre and districts to the south of the SBB line.
Motorway section A12-P12, Samsales-delaVeyre
Veyre interchange (A9-A12) and Samsales. Reconstruction and expansion of a 13,750 m stretch of the A12 motorway (Fribourg section).
Mülimatt Aare Bridge, Brugg
The Aaresteg is an attractive local and regional route for slow traffic connecting Brugg and Windisch to the nearby recreational areas and rerouting much of the cycle traffic from the main cantonal roads.
Multi-family building Wildbachgut, Zurich
Construction of a new multi-family building at Wildbachstrasse 55/57/59 in Zurich with 65 rental flats.
N1.1.1 Section, Zurich - Aargau
The scope of the project encompassed the demolition and removal of the existing noise barriers including supports and the construction of new noise barriers on the N1.1.1 between Zurich Hardturm and the cantonal border to Aargau in nine different stages.
Nestil, Linthal
Construction of the new Tierfehd Pumped Storage Power Station, comprising: Vertical shaft; pipe/pressure gallery; inclined shaft, central shaft complex with entry construction site and transformer station; spherical valve cavern. Pipe gallery length 140 m, pressure gallery length 170 m, inclined shaft length 90 m, surface 6-16 m2.
Noise barrier on A3, Adliswil
Construction of a noise barrier 3-4 m high on a strip foundation. Anchored with 8-10 m deep piles along a length of 1,200 m.
Noise barriers N2, Erstfeld - Silenen - Amsteg (Butzen East)
As part of the maintenance of the motorway bridges and motorway section between Erstfeld and Amsteg, a 750 m, 2-3m high noise barrier was erected between Amsteg and Silenen. The newly erected noise barriers are composed of 1,300 m2 of porous concrete elements, 300 m2 of aluminium elements (absorbent on one side) and of 500 m2 of laminated safety glass walls, 2 x 10 mm, in the area of the Reussbrücke.
Nussknacker multi-family buildings, St. Gallen
Project development and construction of 16 owner-occupied flats.
Oenzberg Tunnel, Aeschi
Mattstetten-Rothrist railway 2000, Oenzberg bei Wanzwil junction.
- 1 double-track tunnel of 3,170 m in length, of which 1,970 m in molasse, west and east cut-and-cover section 880 m (Oenzberg Tunnel). Unconsolidated rock 320 m.
- 2 single-track tunnels of approximately 510 m each. Molasse section 750 m, cut-and-cover section 270 m (Wolfacher North/South).
- Inkwil groundwater tank, 560 m long.
Pedestrian staircases Schiffbau/Escher Wyss Platz, Zurich
New pedestrian staircases for public transport (staircase towers) at the Schiffbau station and Escher Wyss Platz leading up to Hardbrücke.
Philip Morris International Rhodanie Camous, Lausanne
World headquarters of Philip Morris International.
PHZ Lucerne University of Teacher Education Central Switzerland
The former post office building in Lucerne is being transformed into a library and lecture theatres for PHZ Lucerne. With the change of use to one involving high levels of occupancy, a smoke removal concept was developed and subject to a computational test using flow simulation.
Pictet Bank Acacias, Geneva
Retaining structure in the form of a diaphragm wall with a surface area of 12,000 m2 for the headquarters of the Pictet Bank.
Pilot gallery for Rontal Tunnel, Buchrain
Ventilation and investigation galleries for the Buchrain Tunnel.
Pont de la Machine and platform, Geneva
Construction of a platform upstream from the Pont de la Machine.
Pont de la Poya 1, Fribourg
Construction of trenches for accessing the abutments and face of the Palatinat tunnel as well as trenches for the piers of the Poya bridge using anchored shotcrete walls.
Pont de la Poya, Fribourg
The Poya bridge in Fribourg connects Murtenstrasse with Bernstrasse as part of the H182 main road. The 851-metre long structure stretches across the Saane and the sewage plant at an average height of 70 metres above the valley floor. The 10 pillars and 2 pylons that reach a height of 110 metres form 13 bridge sections. The main distance between the pylons is 196 metres. The Palatinat approach viaduct goes directly into the Palatinat tunnel portal.
Porsche Garage, Crissier
Construction of Porsche Garage - Route de Bussigny 31, Crissier.
Postfinance, Bern
Supply of building control systems for remote monitoring of Postfinance branches.
Pressure gallery, Taschinas power station, Prättigau
New pressure gallery for the new Taschinas hydroelectric power station in Prättigau. Shell construction of the following: Access and pressure galleries; gallery intersection; water reservoir; connecting and pipeline galleries with valve chambers; desanders with gravel and sand drainage galleries including operating room; approach cutting for access galleries with portal construction; approach cutting for pipeline galleries with portal construction.
Pumped Storage Power Station Nant de Drance, Finhaut
Construction of a pumped storage station between the existing Emosson and Vieux Emosson reservoirs, in several caverns. The new power station cavern is located at approx. 1,700 m above sea level. Access is granted from below via a five kilometre long gallery and from above via a two kilometre long gallery system. The height difference between the entrance and the turbines is overcome by dropping vertical pressure shafts. In addition to the shell construction of the power station, the contract includes management of the excavated material.
Rail-free access, Altdorf train station
Platform & railway engineering, new pedestrial underpass incl. ramps. Side plaftform, concourse platform and conservation measures.
Relief galleries, Lyssbach, Lyss
The current capacity of the Lyssbach conduit running through Lyss is too small, as clearly demonstrated by the recent flooding caused by the conduit overflowing. Investigations have shown that the flood waters can only be combated by digging a relief gallery between Leen and Fulenmatt, and by expanding the Lyssbach conduit.
Residential complex Sidi site, Winterthur
Residential complex Sidi site, St. Gallerstrasse, 8402 Winterthur.
Residential/commercial building Otto und Alex, Chur
Development of a residential and commercial complex on Bahnhofplatz (station square) in Chur, with a car park (330 parking spaces) and adjacent parking for bicycles.
Residenza Le Ginestre, Lugano-Castagnola
Two residential buildings with owner-occupied flats.
Residenza Parco delle Stelle, Lugano-Pregassona
Three multi-family buildings with owner-occupied flats.
Rheinfelden power station, Rheinfelden
The main work for lot 1B of the Rheinfelden power station involved the creation of a machine house, a work area on the Swiss side including entrance (mine tunnel), a connection to the German side and structural auxiliary facilities.
Rheinpark shopping centre, St. Margrethen
Revitalisation and repositioning of the shopping centre, with a Migros-Markt supermarket, Gastro, Do it + Garden Migros, plus 34 specialist shops covering a total of 21,000 m2 retail space.
Riedmühlepark, Dietlikon
Residential complex with 43 rental flats, 76 owner-occupied flats and 193 parking spaces in an underground car park.
Rolex, Plan-les-Ouates
Construction of a retaining structure in the form of a diaphragm wall supported by a large pre-stressed central ring for the headquarters at Plan-les-Ouates.
Rosenberg shopping centre, Winterthur
Shopping centre comprising more than 40 specialist shops located below 151 rental apartments served by the "James" concierge service.
Rosengarten centre complex, Arbon
Project development for the construction of a new residential and commercial centre in the centre of Arbon. Max Dudler's "Rosengarten" project was the winner of an architectural competition. Base used by retail with Migros-Markt and other shops. 74 rental flats with rose garden.
Rosengarten city centre development project, Arbon
- Sustainability consulting in the tendering phase.
- Investigation of the use of lake-water for heating and cooling.
- Support and consultancy for certification according to the Minergie-Eco standard.
Rossfeld shopping centre, Sierre
Construction of the Migros "Rossfeld" shopping centre in Sierre.
Rue du Cendrier 1-3, Geneva
Construction of a social housing building and a children's day-care centre in the heart of the City of Geneva.
Safety gallery, Giswil
Safety gallery with escape cross-over points every 300 m, tunnel length 1,970 m.
Sandbach, Linthal
Heading and support of a connecting gallery. Length 250 m, cross-section 5.30 m², incline 12.5 %. Creation of an underground water trap.
School consortium, Chermignon
Construction of a crèche, daycare centre and multipurpose hall and primary school.
School swimming pools, City of Zurich
Energy efficiency analysis of school swimming pools.
Securitas, Zollikofen
Supply of a building control system for the HVAC systems and individual room regulation in the administrative building of Securitas in Zollikofen.
Siggenthal Arch Bridge
The new Siggenthal Bridge spanning the Limmat improves the accessibility of Baden by public transportation, optimises the connection to the existing main traffic routes and eases the burden of through traffic on the centre of Baden. The construction of the Siggenthal Bridge brought an idea to life which had been in discussion since the 1920s.
Skymetro passenger tunnel, Zurich Airport
- The Passenger Transport (PTS) Tunnel forms part of the fifth construction phase at Zurich Airport.
- Two tunnel bores with 6.28 m diameter, each 880 m long. Single-skin tubbing construction in ground water.
Sunniberg bridge, Klosters
The Sunniberg Bridge is part of the by-pass around Klosters. It was granted the Outstanding Structure Award 2001. The Sunniberg Bridge has three large primary spans (greatest width 140m) and two smaller side spans, all on 4 pillars. The cable-stayed concept is more impressive than usual thanks to its great technological innovation and pleasant aesthetic.
Sunrise Tower high-rise, Zurich
Tower with 26 floors at Hagenholzstrasse 20/22 in Zurich-Oerlikon.
T300 Spinnenbrücke, Zurich Airport
The "Spinnenbrücke" makes it possible to connect the main traffic routes with the Glattalbahn rapid transit rail and secondary traffic areas without any intersections. The bridge consists of five different, curved branches of variable width.
The Dolder Grand, Zurich
Conversion and new construction of the historic main section of traditional five star luxury hotel.
The Metropolitans, Zurich
The "Metropolitans" housing development in the north of Zurich will incorporate two new apartment blocks and significantly increase the residential property available in the area. The two 19-storey buildings will contain premium freehold apartments which will afford their owners both a view of the Alps in the distance and views stretching from the Üetliberg and the whole city as far as the airport.
Thermal simulation for ETH Zurich, Höngg
Simulations were conducted to evaluate a number of cooling systems in single and multiple-occupancy offices in terms of cost and comfort as part of the renovation of the practical physics building (HPP) on the ETH Zurich Hönggerberg campus. The cold air drop in the proximity of windows was investigated on the basis of flow simulations.
Triangle de l'Etraz, Nyon
Construction of an owner-occupied apartment building, an administrative building and an underground car park (in consortium - ICSA 60%).
Tunnel de Neu-Bois, A16
The Neu-Bois Tunnel comprises two parallel tunnels with two lanes, each of which is 941 m in length (765 m underground). It forms part of the Boncourt to Bure section of the A16 "Transjurane" motorway.
Tunnel Sous la Trême, local road H189, Bulle
Bulle bypass via local road H189: Two-lane road tunnel in loose rock. Cover 3.5 m - 10 m in cultivated area, in ground water. Tunnel length 568 m, excavation cross section 129 m2, all-round sealing in pressure water, concrete inner ring and sub-ceiling.
Tunnel Sous le Mont, Tavannes
Trunk road tunnel with two-way traffic flow, 1,222 m in length (1,137 m mined), 1 emergency bay. The plant utility channel also serves as an escape gallery.
Two single-family houses, Watt
Plastered exterior thermal insulation with ceiling plaster. Brush-finished.
Uetliberg tunnel, Gänziloo
Permanently anchored bored pile wall for the preliminary section of Gänziloo, Uetliberg tunnel, east portal of the N 4.1.5.
University Hospital, East ward blocks 1-3, Zurich
Maintenance of concrete parts of facade of East ward block.
Unterfeld, Baar/Zug
The Unterfeld area lies directly next to the Lindenpark local railway station. Its central role in the sustainable agglomeration of the two flourishing municipalities makes it very important to the towns of Baar and Zug in terms of urban planning. Residential and service units will be realised on the 56,000 m2 site.
Vale International, Saint-Prex
Construction of an office building with basement parking.
Vélodrome, Plan-les-Ouates
Construction of 4 apartment buildings in rue du Vélodrome in Plan-les-Ouates.
Viaduct Grand'Combes, Boncourt
Construction of an autobahn viaduct for the A16 in the Boncourt (JU) district composed of two traffic lanes 371 m long on 7 bridge sections. Cross-section of carriageway slabs in hollow boxed construction with a static height of 2.75 m and a slab width of 11.75 m.
Wagerenhof, Uster
Conversion and renovation of the existing structures. Replacement of multipurpose auditorium and activity building.
Waste incineration plant, Winterthur
Replacement of incineration line L1+4, flue gas cleaning phase.
Wrighthouse, Glattpark
Residential complex with 81 rental flats, 449 m2 of retail space on the ground floor and 41 owner-occupied flats. The complex forms the entrance to the car-free Boulevard Lilienthal in Glattpark, the largest development area in Switzerland.
Zentralbahn railway, Lucerne
The stretch between Lucerne main station and Kriens Mattenhof station is being expanded to a twin track and sunk underground. This project consists of the mined, 550 metre-long Hubelmatt tunnel, the 300 metre-long underground station, the 470 metre-long Allmend tunnel and the 140 metre-long Mattenhof ramp. Enjoy the movie.
Zurich main train station, cross-city link lot 3.1 - underpass south section
The centrepiece of the cross-city link between Zurich-Oerlikon and Zurich-Altstetten currently under construction is the new underground Löwenstrasse train station with 4 tracks at a depth of 16 metres. Trains in the direction of Oerlikon leave the station on two tracks. These tracks first go under the historically protected sandstone building of the southern section before they joined up with the Weinberg tunnel in the direction of the Limmat. Lot 3.1 contains the mined underpass of the southern section and the creation of a construction shaft in front of the southern section that serves, among other things, as the target shaft for the tunnel drilling machine from the Weinberg tunnel. As a sub-contractor to Arge Tunnel Weinberg, Implenia carried out all foundation engineering work in lot 3.1.
Zurich main train station, cross-city link lot 3.2 - shaft for south section
To ensure safe entrance of the tunnelling machine for the Weinberg tunnel target shaft of the southern section at the Zürich main train station, a 16 metre-long, 17 metre-wide and 17 metre-high seal block was created in the existing subsoil with low-pressure injections. The goal was to increase stability and reduce permeability of the soil. The top half of this seal block lies in the Limmat gravel (approx. 1,800 m3 of soil volume), the lower half in the lake deposits (approx. 1,500 m3 of soil volume).













































































































.jpg)


