Skymetro passenger tunnel, Zurich Airport
- The Passenger Transport (PTS) Tunnel forms part of the fifth construction phase at Zurich Airport.
- Two tunnel bores with 6.28 m diameter, each 880 m long. Single-skin tubbing construction in ground water.
Hydro-shield heading with sealed tubbings 1.2 m long, single-skin tunnel.
Map
Specific figures
Contract valueCHF 66.8 million
Construction period2000 - 2001
Length880 m
Total excavated surface31 m2