Tunnel de Neu-Bois, A16

The Neu-Bois Tunnel comprises two parallel tunnels with two lanes, each of which is 941 m in length (765 m underground). It forms part of the Boncourt to Bure section of the A16 "Transjurane" motorway.

  • Excavation and lining, including interior construction.
  • Excavation of a pilot gallery in both bores using an open TBM.
  • Calotte excavation of approximately 50 m2 and bench excavation with a roadheader machine. The lining work includes the creation of a site utility channel, sealing, inner ring and bench.

Map

Specific figures

Order value

CHF 53 million

Construction period

2006 - 2009

Length

941 m

Total excavated surface

82 m2