Tunnel de Neu-Bois, A16
The Neu-Bois Tunnel comprises two parallel tunnels with two lanes, each of which is 941 m in length (765 m underground). It forms part of the Boncourt to Bure section of the A16 "Transjurane" motorway.
- Excavation and lining, including interior construction.
- Excavation of a pilot gallery in both bores using an open TBM.
- Calotte excavation of approximately 50 m2 and bench excavation with a roadheader machine. The lining work includes the creation of a site utility channel, sealing, inner ring and bench.
Map
Specific figures
Order valueCHF 53 million
Construction period2006 - 2009
Length941 m
Total excavated surface82 m2